Well Completion Design

Well Drilling & Completion Technology


In the development of a hydrocarbon reservoir, many wells are drilled and required to be completed, to allow the structure to be depleted. However, the drilling and completion operations are crucial to the long-term viability of the wells in meeting the specified objectives. The design and completion of both production and injection wells are required to satisfy several objectives including: • Provision of optimum production/injection performance. • Ensure safety. • Maximize the integrity and reliability of the completion over the envisaged life of the completed well • Minimize the total costs per unit volume of fluid produced or injected, i.e. • Minimize the costs of initial completion, maintaining production and remedial This PetroDeep training course will feature: • The main functions of completion • Developing a high-level completion strategy for wells in a variety of situations • Select tubing, packers, and completion flow control equipment • Understand different sand control techniques and their application

Code Venue Fees ($) Dates
WD005 New York, U.S.A 6500 May 19, 2019 – May 23, 2019
WD005 Dubai, U.A.E 4500 July 28, 2019 – August 1, 2019
WD005 London, U.K. 5500 October 6, 2019 – October 10, 2019

In-House
Register Now
Request Brochure