Selecting & Testing Zonal Isolation Materials

Production & Operation Technology
Project & Construction Management
Well Drilling & Completion Technology


Cementing is the most critical operation for well integrity and zonal isolation. Cementing fluids pumped in the well must have the correct hydraulic properties for mud removal and safe placement, good transition properties from liquid to solid state to prevent gas or fluid migration during the setting time and engineered mechanical properties to withstand wellbore stresses during the life of the well. To design and place a cement well barrier safely and efficiently, laboratory tests are conducted according to industry standards. This PetroDeep training course will allow engineers and field supervisors to have an in-depth knowledge of cementing additives, cement properties and laboratory procedure to select cost efficient cement formulations that are fit for the well condition. This PetroDeep training course will highlight: • Selection of cementing additives. • Laboratory test procedures and equipment. • Laboratory calculations. • Laboratory auditing including calibration, sampling and personnel competency • Laboratory reporting quality

Code Venue Fees ($) Dates
WD003 Paris, France 5500 May 12, 2019 – May 16, 2019
WD003 Boston, U.S.A 6500 October 13, 2019 – October 17, 2019
WD003 Hurghada, Egypt 4000 December 8, 2019 – December 12, 2019

In-House
Register Now
Request Brochure